Subject to changes due to technical improvements ESS Energie Systeme & Service GmbH
12 CHP accessory range – 01/2010
5368 463
2.2.3 Delivery in sections
Article number CHP module type ESS Viessmann
EM-50/81, EM-70/115, BM-36/66, BM-55/88 900-00-0101 7000781
EM-140/207, BM-98/150, BM-123/177 900-00-0102 7000782
Function The conditions at the installation location may make it necessary to handle the CHP module in sections.
If so, it is delivered in two sections:
1. Engine generator unit
2. Heat exchanger unit
Tab. 1 Sectional delivery of CHP module – dimensions and weights
Scope of service The service provided is divided into the following three steps:
1. Dismantling the prepared CHP module at the ESS factory.
2. As a nal step in the handling to be completed on site, the engine generator unit is positioned on the
heat exchanger unit (adjusted accordingly) and secured. Suitable lifting gear (e.g. assembly crane,
lifting pallet truck) for this purpose should be provided on site.
For this step, at least 2 other people (e.g. from the transport staff) should be available to assist at no
extra cost.
3. Re-assembling the prepared CHP module at the ESS factory.
Travel expenses and overnight accommodation for the 2 installers assigned to the job are included.
On-site tasks / • Additional costs incurred for the extra transport load oor
requirements • Overall transportation
• All lifting gear required
• Additional costs that we incur through unavoidable delays during handling or re-assembling the
CHP module
Engine generator unit Heat exchanger unit
Sectional
delivery
CHP module
Weight
in t
Dimensions (L x W x H)
in mm
Weight
in t
Dimensions (L x W x H)
in mm
EM-50/81
EM-70/115
BM-55/88
approx. 1.0 2000 x 800 x 1000 approx. 1.1 3000 x 900 x 1100
EM-140/207
BM-98/150
BM-123/177
approx. 1.5 2400 x 800 x 1200 approx. 2.1 3700 x 950 x 1200
Transport and installation2