
© Viessmann 5443203
| 24
SCU224
S1
S4
S2
S3
R1
R2
System layout 8
The controller calculates the temperature difference bet-
ween collector sensor S1 and tank sensor S2. If the diffe-
rence is larger than or identical to the adjusted switch-on
temperature difference (DT O), the solar pump will be
operated by relay 1, and the tank will be loaded until the
switch-off temperature difference (DT F) or the maximum
tank temperature (S MX) is reached.
Arr 8
Display Channels
Channel Description Terminal Page
INIT
x*
ODB initialization active - 37
FLL
x*
ODB filling time active - 37
STAB
x*
ODB stabilization in progress - 37
COL x Temperature collector S1 37
TSTB x Temperature tank 1 bottom S2 37
TSTT x Temperature tank 1 at the top S3 37
TSFB x Temperature solid fuel boiler S4 37
n1 % x Pump speed R1 R1 38
n2 % x Pump speed R2 R2 38
h P1 x Operating hours R1 R1 38
h P2 x Operating hours R2 R2 38
TIME x Time - 34
A solid fuel boiler will be operated by relay 2, if the tempera-
ture difference between sensors S4 and S3 is larger than or
identical to the adjusted switch-on temperature difference
(DT3O), until the adjusted minimum (MN3O) and maximum
(MX3O) temperature thresholds of the fuel boiler and the
tank are reached.
Comentários a estes Manuais