8. Shut down the boiler, close the gas
shut-off valve, remove the pressure
gauge and close test nipple A
with the screw.
9. Open the ga s shut-off valve and
start the boiler.
Danger
Gas escaping fro m the test
nipple leads to a risk of
explosion.
Check test nipple A for
soundness.
Setting the max. output
Note
The maximum o utput can be limite d for heating operation.Youcanlimitthe
output via the modulation range.
1. St art up the boi ler.
2. Press K + F simu ltaneous ly:
"100" flashes (cor-
responds to 100%
of rated output)
and "A"isdis-
played.
On weather-com-
pensated contr ol
units, the display
additionally shows
"Max. output".
a/b for the required
valuein%ofrated
output as max.
output.
d to confirm.
3. Record the setting for max. output
on the additional type plate sup-
plied with the "technical documen-
tation". Affix the type plate next to
thetypeplateontopoftheboiler.
Checking the balanced flue system soundness (annular gap
check)
For balanced flue s ystems tested together with the wall mounted gas fired boil-
er, some authorities waive the requirement for a soundness test (pressure test)
during commissioning by the flue gas inspector.
Further details regarding the individual steps (cont.)
15
Initial start-up, inspection, maintenance
5692 619 GB
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 123 124

Comentários a estes Manuais

Sem comentários